Handbag Services: Every Route From First Enquiry to Shipped Cartons, With the Numbers Attached
What services does a handbag sourcing and programme-management company run, and which one does a first order need? QUANZHOU JUNYUAN BAGS runs nine service lines for brand owners and sourcing managers: private label, full-package development, sampling, bulk slot booking, inspection, material and hardware development, packaging, export documentation and reorder management. All nine run under one programme manager and one document set. Entry is MOQ 500 pcs per style / colourway, sampling returns in 6-10 working days, bulk runs 35-50 days, and a complete brief is priced within 3 working days.
- Where Each Service Route Starts and Ends
- What a tech pack has to contain before costing starts
- From RFQ to a Priced Quotation in Three Days
- Sampling: Rounds, Costs and the Approval Gate
- How colour approval works across a 500-piece run
- Booking a Bulk Production Slot and Holding It
- Where a programme usually loses three weeks
- Inspection Services: AQL Levels and Report Format
- Material and Hardware Development Support
- Which trade terms and payment structure each route uses
- Packaging, Carton Marks and Export Handling
- Compliance Files Issued With Every Shipment
What services does a handbag sourcing and programme-management company run, and which one does a first order need? QUANZHOU JUNYUAN BAGS runs nine service lines for brand owners and sourcing managers: private label, full-package development, sampling, bulk slot booking, inspection, material and hardware development, packaging, export documentation and reorder management. All nine run under one programme manager and one document set. Entry is MOQ 500 pcs per style / colourway, sampling returns in 6-10 working days, bulk runs 35-50 days, and a complete brief is priced within 3 working days.
Service desk parameters

Where Each Service Route Starts and Ends
A service route is defined by what comes in and what leaves. Private label starts with a reference photograph and ends with a packed branded carton. Development starts with a sketch and ends with a pattern, a die set and a first sample. Inspection starts with a finished lot and ends with a release report.
Private label service
Eight deliverables, specification review to export handling.
Full-package development
Sketch to pattern, die set and sample, tooling settled first.
Private label handbags
Style, material and branding grids, MOQ ladder, cost structure.
Comparing production partners
Five gates: traceability, sampling, quotation, inspection, capacity.
Custom development
Twelve stages from sketch to bulk and their cost drivers.
Wholesale programmes
Unit cost stack, price tiers, assortment and landed cost.
Leather specification
Grades, thickness, temper, hide yield, tannery records.
Inspection and AQL
Defect classes, sample size, switching rules, failed lots.
Technical operations
Cutting, assembly, edge finishing, hardware fitting, packing.
Materials and hardware
Leather, coated fabric, canvas and lining compared.
Sourcing routes
Four routes compared, and how to read a quotation.
Process and decision gates
Every commercial stage from enquiry acceptance to release.
Questions buyers ask first
MOQ, pricing, sampling, lead time, inspection and paperwork.
Two lines are worth naming. Reorder management is cheap only because the first order paid for the specification; compliance files go to the brand, because the importer of record is the party a marketplace or a customs authority will ask.
What a tech pack has to contain before costing starts
A tech pack is the costing document, not a drawing attached for reference. A quotation built on three photographs returns a band; one built on a signed pack returns a number inside it. Eleven fields are needed before the desk prices a style.
- Dimensions. Body, gusset depth and strap drop, each with tolerance.
- Panel map. Every panel named with grain direction and the material on it.
- Hardware schedule. Fitting by alloy, finish and plating thickness.
Panels and hardware carry the cost: eight panels instead of twelve cuts seam length, station time and rejection risk.
From RFQ to a Priced Quotation in Three Days
The quotation desk works to 3 working days from a complete brief, and 5 for a capsule of four or more SKUs where the material buy is costed separately. Complete means silhouettes, quantity per colourway, material direction, target price, branding method, packaging format and destination market.
- Log the brief and return gaps as numbered questions the same day.
- Check buildability — strap drop, hardware against thickness, closure action.
- Price the material, then trimming, hardware and plating as separate lots.
- Issue a band, not a number, with exclusions named.
A band, not a number: material moves with your specification, freight with the market. Read one before the first arrives — where the unit cost is built and nine red flags in a quotation work from the same shape.

Sampling: Rounds, Costs and the Approval Gate
Sampling is short in calendar terms and the line most often mis-planned. The window is 6-10 working days, or 12-15 for framed, hand-woven or stacked builds, and it runs from specification and material sign-off rather than from the enquiry date.
| Round | Trigger | Cost treatment | Output |
|---|---|---|---|
| First sample | Signed tech pack, swatch card | Credited against the order | Sample plus measurement sheet |
| Second sample | Numbered revision list | Fixed engineering charge | Revised sample, closed list |
| Salesman sample | Photography or buyer meeting | Charged per piece | Pieces from bulk material |
| Pre-production sample | Confirmation before the cut | Included on request | Reference unit for the run |
The approval gate is the boundary. A revision after approval is a specification change, not a correction: a new zip puller costs the plated parts, the station time and a moved slot. Keep the tech pack current as the list closes.
How colour approval works across a 500-piece run
Colour is approved in three steps, and the third is where programmes slip. A Pantone code opens the conversation, a lab dip on the production material narrows it, and a shade band closes it, because one dyed lot rarely covers 500 pcs.
- Reference. Pantone TCX or TPX code, plus which panel it governs.
- Lab dip. Dyed on the shipping substrate, submitted in duplicate.
- Shade band. Two physical limits kept at the line for the run.

Approve colour on the material that will ship, never on paper: full-grain leather and coated fabric hold the same pigment differently.
Booking a Bulk Production Slot and Holding It
Capacity is allocated, not ordered. A deposit releases material and reserves a slot held 10 calendar days from the quotation date; after that it returns to the open calendar. Capacity runs across 7 production lines at about 200,000 pcs per month, and bulk runs 35-50 days from the cut.
- Cutting date. Set by material arrival, not by deposit.
- In-line checkpoint. A third through the run, reported with photographs.
- Packing date. Cartons marked and counted as they close.
- Inspection date. Booked with a day of slack after packing closes.
- Handover date. FOB Xiamen once the balance is settled.
Consolidation is the quiet saving: three silhouettes in two colourways, 3,000 pcs across six SKUs, fill one 20-foot container with one inspection and one document set. How lead times shape a launch carries the arithmetic.
Where a programme usually loses three weeks
Three weeks is rarely lost in one place. A revision raised after approval sends the style back into the sampling window, the revised sample queues behind the running line, and inspection is then booked after packing closes.
| Delay | Where it starts | Days lost | Control |
|---|---|---|---|
| Second sampling round | Revision raised after the approval gate | 6-10 working days | Numbered revision list issued before the cut |
| Material sitting on hold | Shade band or finishing unsigned | 5-8 days | Sign the swatch card at quotation stage |
| Late inspection booking | No slack left after packing closes | 3-5 days | Book inspection with a day of slack |
The control is a shared calendar with named owners. Approval, material release, cut, packing and inspection dates sit in one document circulated at quotation, so a slip in one line shows in the others.
Inspection Services: AQL Levels and Report Format
Inspection is a sampling plan, not an opinion. Default is AQL 2.5 under ISO 2859-1 at General Inspection Level II: a lot of 3,201 to 10,000 draws 200 pcs, 10 defects acceptable, 11 rejects the lot. Choosing an AQL level sets out where 2.5 is right.
- Incoming material. Hides and lining graded, shade band recorded.
- In-line. Stitch density and edge finish checked while correction is possible.
- Final random. The AQL draw, defects assigned to critical, major and minor classes.
- Packing. Count per carton, marks, barcode scan.
- Third-party. Booked through SGS where an independent report is required.
The report is the deliverable: lot reference, sample size, AQL applied, defects by class, photographs and a stated pass or fail. Tie the balance to that document, not to a calendar date.
Material and Hardware Development Support
This line runs from a material direction to a signed swatch card. Leather is sourced by grade, thickness and temper, hides traced to tanneries audited under the Leather Working Group (LWG) protocol. Coated fabric and canvas match a Pantone reference. Hardware is specified by alloy, plating thickness and sealer.
- Swatch cards. Three to five options, signed as reorder reference.
- Colour matching. Pantone to dyed lot, with an acceptable shade band.
- Hardware. Zinc alloy or iron base, plating thickness and sealer named.
- Interlining and foam. Structure by weight and compression.
- Failure testing. Abrasion, colour fastness and strap pull before the bulk buy.
Two questions decide it: which material carries the visible surface, which carries the stress. Material choice on a budget and when tooling is charged follow from there.
Which trade terms and payment structure each route uses
Trade terms decide where risk transfers and who pays for each leg. FOB Xiamen is the default; CIF and DDP are quoted where a door price is required.
- FOB Xiamen. Risk and cost transfer at the port of loading.
- CIF. Carriage and insurance to the named port included; risk still transfers at loading.
- DDP. Door delivery with duties handled; the longest quotation to prepare.
- Balance. Settled on the inspection report rather than on a calendar date.
Incoterms 2020 from the ICC decides where risk transfers and which party insures which leg, and the code quoted should match the contract a buyer signs. WIPO administers the trademark registration behind a lining label.
Packaging, Carton Marks and Export Handling
Packaging is 3-8% of unit cost and a disproportionate share of perceived value, and the line most often rushed. Specify the format your channel requires at brief stage: a barcode that will not scan is discovered at goods-in, the most expensive place to find out.
- Dust bag. Cotton or polyester, printed, weight specified in g/m².
- Hangtag. Coated card at 300-350 gsm, string or rivet named.
- Care card. Fibre content, care instructions and country of origin.
- Barcode. EAN-13 or UPC-A by channel, proofed before printing.
- Carton. Burst or edge-crush rating, marks, count and weights.
Plates and setup are fixed charges, so unit cost falls steeply between 500 and 2,000 pieces. Consignments run 12-24 pieces per carton. Packing for the channel starts from the channel requirement.
Compliance Files Issued With Every Shipment
Documentation is issued to the brand, not held by the production partner, because the importer of record is the party who needs it. A consignment file carries nine documents: invoice, packing list, bill of lading, certificate of origin, test reports, the audit reference for our validated partner factory Quanzhou Yingming Bags, inspection report, packing declaration and insurance certificate.
- REACH (EC 1907/2006) Annex XVII. Chromium VI in leather to ISO 17075, plus azo dyes.
- California Proposition 65 (Prop 65). Hardware, coated trim and dyes against safe-harbour levels.
- CPSIA. Lead and phthalate limits plus tracking labels for children's items.
- BSCI (amfori) and Sedex / SMETA. Audit references for the validated partner factory.
- Global Recycled Standard. Transaction certificates supporting a recycled-content claim.
Export paperwork follows the same nine-document format used by our validated partner factory Quanzhou Yingming Bags, whose export experience since 2014 covers the European Union, the United States, Japan and Australia. The SGS-validated partner factory holds the audit references cited in the file.
Four bodies sit behind most of the paperwork named here. ASTM International publishes the test methods covering strap pull, seam strength and hardware corrosion. SATRA issues test methods for leather, hardware and accessories. The Leather Working Group audits tannery environmental performance and traceability. Textile Exchange administers the Global Recycled Standard and the transaction certificates behind a recycled-content claim.
Ask for the report reference, not a pass statement: a report names laboratory, method, sample and date. Import documentation and the service scope in full cover the rest.
- What a private label service includes, item by item
- How a tech pack is put together before quotation
- Where the unit cost is built, line by line
- Choosing an AQL level for a first order
- Packing for the channel rather than the photograph
- Material choice on a budget, durability held
- Nine red flags to look for in a quotation
- How lead times shape a launch date
- How the MOQ changes between 500 and 2,000 pieces
- Import documentation for handbag consignments
Route your programme to the right service line
Send the silhouettes, material direction, quantity per colourway, destination market and launch date to service@junyuanbags.com, or message +86 177 5002 0688 on WhatsApp. A programme manager returns a priced specification within 3 working days and holds a bulk slot for 10 calendar days.
Frequently Asked Questions
What services are covered on this page?
Nine lines: private label, full-package development, sampling, bulk slot booking, inspection, material and hardware development, packaging, export documentation and reorder management. Each has a start state and an end deliverable, and all run on one signed specification, one bill of materials and one inspection report.
How quickly is a quotation returned?
Within 3 working days of a complete brief, and within 5 for a capsule of four or more SKUs where the material buy is costed separately. A brief is complete when it carries silhouettes, quantity per colourway, material direction, target price, branding method, packaging format and destination market.
How long is a production slot held?
Ten calendar days from the quotation date. A deposit releases the material buy and reserves capacity; if it does not arrive inside the hold, the slot returns to the open calendar, which in a peak season usually means a materially later start rather than a slightly later one.
How many pieces are inspected on a bulk lot?
At AQL 2.5 under ISO 2859-1 and General Inspection Level II, a lot of 3,201 to 10,000 pieces draws 200 pcs, with 10 defects acceptable and 11 triggering rejection. Other lot sizes draw different sample sizes under the same code-letter table, so the level applied belongs on every report.
Is the first sample included in the programme cost?
The first sample is usually credited against the order. A second round, triggered by a numbered revision list, is quoted as a fixed engineering charge, and salesman samples are charged per piece. A pre-production reference sample sits inside the programme on request, and every charge is confirmed in writing before a round begins.
Which sampling window should a first programme plan around?
Six to ten working days for a standard construction, or twelve to fifteen where the build is framed, hand-woven or stacked. The window runs from specification and material sign-off rather than the enquiry date, so artwork, barcodes and slot booking should run in parallel and approval time should be planned as its own line in the calendar.
Can several SKUs be consolidated into one shipment?
Yes, and it is the usual arrangement. Three silhouettes in two colourways, 3,000 pcs across six SKUs, typically fill one 20-foot container with a single inspection and a single document set, spreading fixed logistics cost across the programme rather than repeating it per style.
Is third-party inspection available as well as in-house inspection?
Yes. In-house inspection at AQL 2.5 under ISO 2859-1 sits inside the programme. Third-party inspection, for example through SGS, is quoted separately and is worth booking for a first order, a large single lot, or wherever a retailer requires an independent report, and the fee is quoted per man-day.
Which documents come with a consignment?
Nine: commercial invoice, packing list, bill of lading or airway bill, certificate of origin, material test reports, the audit reference for the validated partner factory, the inspection report, the packing declaration and the insurance certificate where CIF applies. All are issued to the brand as importer of record.
How does a reorder differ from a first order?
The specification is already signed, so the sampling round is skipped and the run starts from material release. Unit cost usually improves because tooling is amortised and the line needs no new setup, and the lead time becomes the bulk window plus inspection and export handling.
What does a tech pack need before a price can be issued?
Eleven fields, five of which carry most of the unit cost: dimensions with tolerance, a named panel map with grain direction, stitch specification, a hardware schedule giving alloy and plating thickness, and the branding method with artwork position. Lining, interlining, closure, load path and packing format complete the set. Gaps return as numbered questions the same day.
How is colour approved across a 500-piece run?
In three steps. A Pantone TCX or TPX reference opens the discussion, a lab dip dyed on the shipping substrate narrows it, and a production shade band closes it. The band is two physical limits held at the line and filed against the style. A draw from the first packed carton is checked against it before release.
When should a brand move away from FOB Xiamen?
FOB Xiamen suits a brand with an established freight forwarder, since risk transfers at the port of loading and the brand books main carriage. Move to CIF when carriage and insurance to a named port should sit inside the unit price. Choose DDP when a door price with duties handled is what the finance team needs.
Which organisations govern the standards referenced on this page?
ASTM International publishes the test methods covering strap pull, seam strength and hardware corrosion. SATRA covers leather, hardware and accessory testing. The Leather Working Group audits tannery environmental performance and traceability. Textile Exchange administers the Global Recycled Standard and its transaction certificates. The ICC publishes Incoterms 2020 on risk transfer.
People Also Ask
Which service line should a first order start with?
Private label, in most cases. It starts from a reference photograph rather than a finished drawing, samples in 6-10 working days and reaches bulk in 35-50 days — the shortest credible route to goods at MOQ 500 pcs per style.
Do I need a complete tech pack before requesting a quotation?
No. Three reference photographs and a one-page specification with dimensions, strap drop and material direction are enough for a price band. A full tech pack narrows the band and keeps sampling inside the 6-10 working day window.
Is inspection included or billed separately?
In-house inspection at AQL 2.5 under ISO 2859-1 is included. Third-party inspection through SGS is quoted separately, and is worth the fee on a first order, a large single lot, or where a retailer wants an independent report.
How many colourways make sense for a first line?
Two. One is the minimum commitment at 500 pcs; two gives the shopper a choice without multiplying dye lots. A third is realistic once the style has a reorder history and the shade band is recorded.
What happens if a lot fails inspection?
The lot is not released. The options are a rework and re-inspect cycle, a sorted shipment with an agreed allowance, or rejection and remake, and the cost and schedule effect of each is stated before you decide.
Sources and further reading
Every figure on this page is either our own programme data or attributed below. Open the originals before you write them into a specification.
- ASTM International — technical standardsASTM International Publishes the test methods governing strap pull, seam strength and hardware corrosion checks.
- SATRA — technical services for leather, footwear and accessoriesSATRA Independent test methods for leather, hardware and accessory performance.
- Incoterms rulesICC Incoterms 2020 decides where risk transfers and which party insures which leg.
- World Intellectual Property OrganizationWIPO Administers the international trademark registration behind a lining label and a logo plate.
- Leather Working Group — environmental auditing for tanneriesLeather Working Group Audits tannery environmental performance, the basis for leather traceability claims.
- Global Recycled Standard (GRS)Textile Exchange Issues the transaction certificates that support a recycled-content claim on lining or webbing.