Handbag Tech Pack Template: Sections Every New Brand Needs

Which sections does a handbag tech pack need before a first sample can be cut? Eight: a cover page with commercial data, dimensioned drawings with tolerances, a bill of materials with unit costs, a construction and stitch specification, a hardware schedule in microns, a branding and packaging schedule, a compliance and test block, and a revision history with sign-off. Priced in days, a missing section costs 6-10 working days of sampling plus 3-6 days of review, which is why the two sections most often skipped — the stitch specification and the hardware schedule — are the two that generate the most rework. The template below is eight pages, each one a form to fill rather than an essay to write.

Handbag Tech Pack Template: Sections to Include

Which sections does a handbag tech pack need before a first sample can be cut? Eight: a cover page with commercial data, dimensioned drawings with tolerances, a bill of materials with unit costs, a construction and stitch specification, a hardware schedule in microns, a branding and packaging schedule, a compliance and test block, and a revision history with sign-off. Priced in days, a missing section costs 6-10 working days of sampling plus 3-6 days of review, which is why the two sections most often skipped — the stitch specification and the hardware schedule — are the two that generate the most rework. The template below is eight pages, each one a form to fill rather than an essay to write.

The template in numbers

SectionsEight, one page each
Dimensional tolerance±2 mm panels, ±5 mm handle drop, ±10 mm strap
Stitch specificationTex 40, 7-9 SPI, 10 mm seam allowance
Hardware5-8 micron nickel undercoat, 24 h to ASTM B117
Branding datumPosition in mm from two stated edges
MOQ500 pcs per style / colourway
Sampling6-10 working days (12-15 complex)
InspectionAQL 2.5 under ISO 2859-1 · FOB Xiamen · T/T

What a Tech Pack Is Worth in Days and Dollars

A tech pack is the cheapest insurance in a development programme. It costs a day or two to assemble and it decides how many of the 6-10 working days of sampling windows a first line spends. Worked backwards from the calendar, the arithmetic is unforgiving: each unresolved section becomes one more round, each round is 6-10 working days plus 3-6 days of review, and two extra rounds is the difference between hitting a season and missing it.

A Vancouver outdoor brand sent a brief for a 30 cm convertible shoulder bag with three photographs and a rendered silhouette, and no written dimensions. The first sample came back in 8 working days with the strap anchors 12 mm narrower than intended and the webbing 20 mm webbing used where a 25 mm had been assumed; the second corrected both and arrived two days after the photography booking. The drawings had existed. They had not been dimensioned, and dimensioning is the part of a drawing that does the work.

  • One missing section costs one round, which is 9-16 calendar days including review.
  • Two missing sections usually cost two rounds, because a revision list can only carry the faults it can see.
  • A complete pack costs one to two days and is reused on every repeat of the style.
  • The reuse is the return. A stored tech pack is what lets a repeat order skip sampling entirely.

Section One: Cover Page and Commercial Data

The cover page carries the commercial facts that decide what the rest of the pack can specify. Without a target retail price there is no ceiling to engineer against, and without a quantity per colourway there is no basis for a material buy. This page is read first and quoted from, so it should be the most boring and most complete page in the document.

  • Style name, style code and season, so revision history can be attached to a stable identifier.
  • Quantity per colourway, remembering that 500 pcs is per style and per colourway.
  • Target retail price and target landed cost per SKU, which is the ceiling the specification is engineered to.
  • Destination market and trade term: FOB Xiamen, CIF or DDP, with payment by T/T.
  • Launch date and the date sampling must finish, stated as dates rather than as a month.
  • Contact for approvals and the turnaround that contact commits to during revision.

Section Two: Dimensioned Drawings With Tolerances

Drawings carry three things: orthographic views, dimensions in millimetres, and tolerances. Orthographic means front, back, both sides, base and a cross-section; six views is normal for a structured body and four is enough for a soft one. Every dimension gets a tolerance, because a dimension without one is a wish, and the conventions are stable across the trade.

Handbag tech pack drawing sheet with front side and base views dimensioned in millimetres with tolerance notes
Section two in practice: front, side and base views, every dimension in millimetres and a tolerance note on the sheet.
What section two should state, line by line
ItemValueToleranceNote
Body width300 mm±2 mmSets panel yield
Body height240 mm±2 mmProportion against handle drop
Gusset depth110 mm±2 mmBelow 90 mm the body slumps
Handle drop120 mm±5 mmFirst measurement customers complain about
Strap length1,100-1,300 mm±10 mmAdjustable, so state the range
Pocket depth170 mm clear±3 mmAfter lining, not as cut
Logo position25 mm from top datum±2 mmMeasured from two stated edges

Two conventions prevent most disputes. State a datum — a named edge or corner from which positions are measured — and state pocket dimensions as internal clear values after lining, because a lining turn costs 1-2 mm at every mouth. The guide to what a tech pack should actually include covers the same ground section by section, and the pattern note on why a good pattern beats a render explains why the cross-section view matters more than the pretty one.

Section Three: Bill of Materials With Unit Costs

A bill of materials lists every input by name, specification, source type and consumption per bag. It is the page that turns a drawing into a price, and it is the page where a substitution is caught: if the BOM says 210D ripstop at 70 gsm and the swatch card says 190T at 55 gsm, the discrepancy surfaces in a day rather than at inspection.

  • Each material on one line: name, specification, colour reference, supplier type and unit.
  • Consumption per bag, in square feet for shell materials and in metres or pieces for trims.
  • Unit cost and currency, with a note on whether the price is held per order or per season.
  • Lead time per line, because the longest line governs the material confirmation window of 2-4 days.
  • Substitute policy: whether an equivalent may be used without written approval. It should not be.

Add a yield line. Hides yield 80-85 percent and synthetics 88-92 percent, and the difference is priced into every unit. A BOM that ignores yield produces a quotation that looks right and a landed cost that does not.

Section Four: Construction and Stitch Specification

The most-skipped section and the one that decides whether a bag survives its warranty period. Four lines cover it, and all four are measurable at the bench with a gauge and a ruler, which is why an inspector counts them first.

  1. Thread: Tex 40 bonded polyester on bodies, Tex 69 at load points such as strap anchors and handle joints.
  2. Stitch density: 7-9 stitches per inch, counted with a gauge rather than judged by eye.
  3. Seam allowance: 10 mm on load-bearing joints, 6-8 mm on lining seams and pocket mouths.
  4. Reinforcement: a bartack over a minimum contact patch of 40 mm by 25 mm behind every strap anchor, plus an interlining patch behind every closure.

Two optional lines repay the effort. State the seam type at each joint — plain, bound, turned or French — because a turned edge and a raw painted edge read as different price points on the same silhouette. And state the edge finish explicitly: edge paint in two to four coats sanded between each, or a turned and topstitched edge, which costs more and lasts longer.

Section Five: Hardware Schedule in Microns

Hardware is the second most-skipped section, and skipping it is expensive because a plating bath costs the same at 300 pieces as at 3,000. The schedule lists each component, its base metal, its plating stack in microns, its colour reference and the test it must pass.

A hardware schedule, filled in
ComponentBase metalPlating stackTest
Main zipper, number 5Coil, brass teethNickel 5-8 microns500 open-close cycles
Puller, 30 mmZinc alloyNickel 5-8, gold 0.1-0.2ASTM B117, 24 h
D-rings, 3 mm wireZinc alloyNickel 5-8 microns30 kg pull, 10 s
Magnetic snap, 18 mmZinc alloy plus magnetNickel 5-8 microns25 N hold force
Foot studsBrassNickel 5-8 micronsVisual and adhesion

Two columns get filled from the drawing rather than guessed: the finish name, which is a colour reference such as light gold or gunmetal rather than a description, and the test method, which should be named rather than implied. Where a component carries a logo, add the tooling line: who paid for the mould, where it is stored, and whether it will ever run for another brand.

Section Six: Branding, Labelling and Packaging

Branding is a position in millimetres and a method, not a note on a drawing. State the method — emboss, deboss, foil, screen print, woven label, metal plate or embroidery — and the position measured from two stated datum edges with a tolerance of plus or minus 2 mm. Emboss depth of 0.3-0.5 mm is the normal range on leather and 0.2-0.3 mm on a coated synthetic; deeper reads better in a photograph and thinner survives abrasion better.

  • Logo artwork as a vector file, with the pantone or foil colour referenced to a Pantone TCX code at Delta E 2.0 or better.
  • Woven label: dimensions, fold type and stitch position, usually 20 mm by 45 mm at the lining seam.
  • Hangtag: 300 gsm art card, dimensions, string type and any barcode symbology.
  • Dust bag: material, gsm, drawcord type and print method.
  • Carton: five-ply board, units per carton, carton marks and dimensions, with the polybag warning text at a minimum 4 mm type height.

Packaging is ordered separately and arrives late more often than the bags do, so put dates on this page as well as specifications. Marketplace channels add their own rules on barcodes and prep, and those belong here rather than in an email.

Section Seven: Compliance and Test Requirements

Compliance is a section in the pack rather than a question at shipment. Naming the standards up front means the material is sourced to meet them rather than tested after it has been bought, and the difference is two weeks and occasionally a rejected shipment.

  • REACH Annex XVII restrictions on chromium VI, azo dyes, nickel release and phthalates for the European market.
  • Proposition 65 review of hardware and coated trim for California; CPSIA documentation where a bag is marketed to children.
  • Global Recycled Standard transaction certificate for any recycled content claim, and OEKO-TEX STANDARD 100 where textiles sit against skin.
  • ISO 105-B02 light fastness at grade 4, AATCC 8 crocking at grade 4 dry and grade 3 wet, ISO 12947-2 abrasion at 20,000 rubs for daily carry.
  • ASTM B117 salt spray at 24 hours to first corrosion on plated hardware.
  • BSCI or Sedex audit reference and an ISO 9001 quality system reference, both available for our validated partner factory Quanzhou Yingming Bags.

Section Eight: Revision History and Approval

The last section is the one that makes the document a record rather than a snapshot. Every revision is numbered, dated and summarised in one line, and each round ends with a signature and a date on both sides. A numbered history means the third sample can be checked against the second revision rather than against a memory, which is the only reliable way to stop an item being lost between rounds.

Approved handbag tech pack with revision history table and signed sample reference card ready for bulk production
Section eight: a numbered revision history and a signed reference card, which together make the bulk lot checkable.
  • Number every revision, one row per round, with the date and a one-line summary of what changed.
  • Reference the annotated photographs rather than describing the fault in prose.
  • Separate must-fix from nice-to-have so a round can be approved on the must-fix list alone.
  • Sign and date the sealed sample and record where it is held, because it is the standard for the bulk lot.

The One-Page Template You Can Copy

Condensed to a checklist, the eight sections fit on a single page. Tick each one before the pack is sent; an unticked box is a round of sampling waiting to happen.

Eight sections, and what a missing one costs
SectionMust containCost if missing
1. CoverQuantity, target retail price, term, launch dateA quotation too wide to plan against
2. DrawingsSix views, dimensions, ±2 mm tolerances, datumOne extra round, 9-16 days
3. BOMEvery input, consumption, unit cost, yieldSubstitution discovered at inspection
4. ConstructionTex, SPI, seam allowance, reinforcementField failures at strap and closure joints
5. HardwareAlloy, microns, finish, named testCorrosion complaints in month three
6. Branding and packingMethod, position, carton, barcodeLate packaging, missed listing date
7. ComplianceREACH, Prop 65, CPSIA, certificatesA held shipment at destination
8. Revision historyNumbered rows, dated sign-offsAn item lost between rounds

Two companions finish the picture. The acceptance-first guide to building a tech pack covers how the document is read on the sampling bench, and the prototype costing guide turns the bill of materials into a number before any tooling is cut. The process reference sets the wider sequence from brief to inspection.

One Tote, Filled In: All Eight Sections on a Page

The template is easier to copy when it has numbers in it. Below is a single 32 cm tote filled in as it would be sent, with the eight sections compressed into one table. Nothing here is unusual; that is the point. Every field is one that a sampling bench expects to find without asking.

A 32 cm canvas tote with a leather trim, written out as a one-page specification
SectionEntryTolerance or test
1. Cover500 pcs, two colourways, target retail USD 129, FOB Xiamen, T/TLaunch date stated as a date
2. Drawings320 by 280 by 110 mm, handle drop 240 mm, strap 1,100 mmPlus or minus 2 mm panels, 5 mm drop, 10 mm strap
3. BOM12 oz canvas 340 gsm, 1.2 mm leather trim, 210D lining 78 gsmConsumption 0.85 m and 0.4 sq ft per bag
4. ConstructionTex 40 bonded polyester, 8 stitches per inch, 10 mm allowanceBar-tack 40 by 25 mm at four anchors
5. HardwareZamak 3 D-rings, nickel 5-8 microns, #5 coil zipASTM B117 at 24 h; 500 open-close cycles
6. Branding and packingEmboss 60 mm, 25 mm from the top datum; hangtag 300 gsmPlus or minus 2 mm; barcode symbology named
7. ComplianceREACH Annex XVII, Proposition 65 review, ISO 105-X12Grey scale 4 dry and 3 wet
8. RevisionRev 02, dated, one-line summary per roundSigned and dated by both sides

How to Send the Pack So It Is Quoted in a Day

A quotation takes a day when the pack answers every question in it and takes a week when it does not. The format matters as much as the content, because a file that cannot be measured or plotted has to be redrawn before anything can be priced.

  • One PDF, under 5 MB. Drawings, BOM, hardware schedule and branding in a single document with a page per section, so nothing is lost between files.
  • Vector artwork for every mark. An AI, EPS or SVG file rather than a PNG, with the Pantone TCX code named alongside it.
  • Dimensioned drawings, not renders. A render shows proportion; a dimensioned orthographic view with a datum is what a pattern can be graded from.
  • Reference photographs, three to six. Overall views plus the details that matter: the strap attachment, the closure, the interior.
  • A target retail price. Material follows the retail price, so a ceiling turns a guess into a specification.

How the Pack Becomes the Inspection Checklist

A specification only becomes enforceable when it is copied into the document an inspector holds. ISO 2859-1 answers how many units to draw and how many defects fail a lot; it does not say what a defect is. That comes from the pack, which is why the transfer below should be done at approval rather than at inspection.

Four pack lines, the inspection check each becomes and the count that applies
Pack lineInspection checkSample and pass condition
Dimensions with toleranceMeasured on drawn units with a steel rule50 units from 500; none outside plus or minus 2 mm
Stitch density and threadCounted over a 25 mm run at the side seam7-9 per inch; a fourth major fails the lot
Hardware plating and testVisual plus a chamber result on retained samples4 samples; no base-metal corrosion at 24 h
Colour reference and Delta ECompared against the retained swatch under D6550 units; Delta E 2.0 or better

Send the drawings, get the pack back completed

Send sketches, dimensions and a target retail price. A private label coordinator returns the eight-section pack filled in, with tolerances, microns and test methods written in, at sampling of 6-10 working days, bulk of 35-50 days and inspection at AQL 2.5 under ISO 2859-1. Get a quote.

Frequently Asked Questions

What sections does a handbag tech pack need?

Eight: a cover page with commercial data, dimensioned drawings with tolerances, a bill of materials with unit costs and yield, a construction and stitch specification, a hardware schedule in microns, a branding and packaging schedule, a compliance and test block, and a numbered revision history with sign-off.

How much detail do the drawings need?

Six orthographic views for a structured body and four for a soft one, every dimension in millimetres with a tolerance, a stated datum edge for positions, and pocket dimensions given as internal clear values after the lining turn rather than as cut dimensions.

What tolerances should a tech pack state?

Plus or minus 2 mm on body panels, 5 mm on handle drop, 10 mm on an adjustable strap, 3 mm on pocket depth and 2 mm on a logo position measured from a stated datum edge. A dimension without a tolerance is a wish and gets re-decided at sampling.

Why does the bill of materials need a yield line?

Because bought material is not all usable. Hides yield 80-85 percent and synthetics 88-92 percent, and the difference is priced into every unit. A bill of materials without yield produces a quotation that looks right and a landed cost that is not.

What stitch specification belongs in a tech pack?

Four lines: Tex 40 bonded polyester thread on bodies and Tex 69 at load points, 7-9 stitches per inch counted with a gauge, a 10 mm seam allowance on load-bearing joints, and a bartack over a 40 mm by 25 mm patch behind every strap anchor.

How should hardware be specified?

By base metal, plating stack in microns, finish colour reference and named test. Zinc alloy with a 5-8 micron nickel undercoat under a 0.1-0.2 micron gold topcoat, tested to ASTM B117 for 24 hours to first corrosion, is a workable line for a mid-market bag.

How deep should an embossed logo be?

Between 0.3 and 0.5 mm on leather and 0.2 to 0.3 mm on a coated synthetic. Deeper reads better in product photography and shallower survives abrasion longer, so the choice is usually made by the price band and how the bag will be photographed.

What packaging details belong in the pack?

Logo method and position in millimetres, woven label dimensions and fold, hangtag card weight at around 300 gsm, dust bag material and drawcord, and carton specification with units per carton, carton marks and a polybag warning text at a minimum 4 mm type height.

Which compliance standards should be named?

REACH Annex XVII for Europe, Proposition 65 for California, CPSIA where a bag is marketed to children, Global Recycled Standard for recycled claims, plus ISO 105-B02 light fastness, AATCC 8 crocking, ISO 12947-2 abrasion and ASTM B117 corrosion.

Why is a revision history section necessary?

Because a revision list that lives in four emails loses items. Numbering every round with a date and a one-line summary lets the third sample be checked against the second revision rather than against memory, and gives the bulk lot a single standard to be measured against.

How long does a complete tech pack take to write?

One to two days for a first silhouette, and a few hours for each subsequent style in the same range once the hardware and compliance blocks exist as templates. That investment removes one to two sampling rounds of 9-16 calendar days each.

Can a prototype be costed before tooling is cut?

Yes, and it should be. Once the bill of materials carries consumption, unit cost and yield, a prototype can be priced before any embossing die or hardware mould is committed, which is the point at which a design change is still cheap.

What happens to the tech pack after the first order?

It becomes the stored specification. On an unchanged repeat it allows sampling to be skipped entirely, removing 6-10 working days, and it gives the inspection a standard to measure the bulk lot against rather than a reference photograph.

People Also Ask

Do I need a tech pack for a simple bag?

Yes. A simple silhouette still has eight decisions, and the simpler the bag the more the joints carry the load. A one-page specification is enough for a soft body; a structured body needs the full eight sections.

Can photographs replace drawings?

They can start the conversation but they cannot carry tolerances. Three reference photographs plus a one-page written specification is the minimum; six dimensioned views is what removes the guesswork from the sampling window.

Which section is most often left blank?

The construction section. Dimensions get written because they are visible; thread, stitches per inch, seam allowance and reinforcement patches do not, and those four are what an inspector counts first.

Who should sign the revision history?

One named approver on the brand side and one on the programme side, with dates. Two signatures make the sealed sample a standard rather than a preference, and that is what makes a bulk lot checkable.

Sources and further reading

Every figure on this page is either our own programme data or attributed below. Open the originals before you write them into a specification.